MITU Project ($100k+) Updated 16/03/2026 |
||||
| Business area | Programme/
Project Name |
Summary of Project | Commencement | Latest Update |
| Digital | Digital – Cloud & Platform Services – MIT Data Centre (GreenLake IaaS expansion) | This project addresses critical infrastructure risks at MIT and strengthens vendor and geographic resilience. | Commencing April 2026 | The business case has been sign-off by the council and the programme is now being set up for the delivery phase. Orders have been placed with vendors for the infrastructure lead time 6- 8 weeks |
| Digital | Core Business Application -Corporate Governance & Risk Managemen | This project is to find and implement a solution/system for managing Health & Safety and Risk | The vendor evaluation is still in progress, and the business case remains in draft. Both the business case development and the vendor evaluation will be progressing starting the week of 23 March 2026 | |
| Digital | Cybersecurity & Identity – Identity Management Unified Entra Tenancy (vendor TBA)- Phase 2 | This project enables a seamless, integrated experience that allows staff, students, and partners to collaborate effectively across all campuses.
Ensure relocated ITP/ITO staff can fully access campus resources to continue their work without disruption |
Commenced December 2025 | The cost estimate for Phase Two (build) necessitated a go-to-market process, which has deferred the build and migration activities. An updated baseline schedule will be defined post vendor selection.
The delay of this project have impacted the Microsoft 365 Tenancy Consolidation Project. Microsoft 365 tenancy consolidation is the planned migration of users, data, identities, and services from multiple Microsoft 365 tenants into one standardised tenant to enable consistent collaboration, governance, security, and cost management. |
| Digital | Platforms- PPM Solution (OnePlan ) | This project is to acquire and implement a Programme/Project Management tool. Through provider solution selection, MITU is progressing with OnePlan. | Commenced January 2026 | The issue of MIT credentials not being able to log into OnePlan has been resolved on 17-March.
UAT testing for Digital can continue now without disruption, after we have lost nearly 4 full days. A kick-off meeting with Property was done last week. The original timeline to go live with Digital before Easter is challenged |
| Digital | Network Modernisation FY25/26 (LAN) – Unitec | In October 2023, outdated network equipment was replaced. This included major network switches, a Wi-Fi upgrade, better separation of network traffic, improved fibre connections, and a carefully managed changeover to avoid downtime.
The second batch of equipment was delivered on 14 January. Implementation is being completed building by building. |
Starting March 2026 | • The second batch of equipment was delivered on 14 January. Implementation is being completed building by building.
• Switch replacement in Building 48 was completed on Friday, 20 February. • Work in Building 112 was partially completed over the weekend of 21 February. • Buildings completed: 097 107 178 111 114 115 Planned next steps • B112 – most are completed, Security cameras and SEATs readers are still on a legacy switch. • B108 – most are completed, one lab on level 1 and several small computer rooms on level 2 that are on Avid switches need be planned with external support partner. Planed for the rest of March: • Prefab buildings 156- 165 – this may require reschedule as network team identified the connection is linked to another building. • B103 • B059 • B110 – some comm rooms. the rest are scheduled in April • B180 – some comm rooms. the rest are scheduled in April • B182 |
| Property | B48 Seismic Upgrade | This project is to Upgrade building 48 | Completed | All works have been completed in accordance with the approved requirements and business case
Corrective works are currently being undertaken to address items identified at completion. Fewer than ten items remain outstanding, all of which are covered under warranty and do not impact the project budget. |
| Property | Mahurangi – Exit | Completed January 2026 |
|
|
| Property | Building 170 Demolition | Completed December 2025 | ||
| Property | MIT Vehicle replacement | This project involves the replacement of two vehicles that are currently out of service due to significant corrosion and
mechanical issues. Both vehicles are unable to obtain a current Warrant of Fitness (WOF) and are no longer fit for operational use. I |
Await the Health & Safety assessment from the Health & Safety team.
Develop and submit a business case to seek funding approval. |
|
| Property | Mt Albert HVAC upgrade B111 – 115 | This project aims to upgrade Buildings 111–115 with new HVAC systems | Commenced March 2026 | Initial investigations have commenced to confirm the project scope and assess the electrical capacity of the buildings
Subject to the outcome of the electrical capacity assessment: If insufficient capacity is identified, this project will be placed on hold and a separate project will be scoped to address the required electrical upgrades. If sufficient capacity is confirmed, the next steps will be to commence the vendor selection process, followed by development of a business case for funding approval |
| Property | Unitec Mt Albert B115 Water proof / roof repair | Repairing building 115 roof | Starting End of March 2026 | Work is beginning on Building B115 at the Mt Albert Campus to replace the roof and some other minor works. The building will remain open throughout the project which is set to start on Tuesday 8 April and be completed by late September/October 2026. The small number of staff and students who will be affected have been communicated with about room changes. Only staff and students who occupy the top floor of the building will be affected.
Scaffolding will be erected around all sides of the building, and the exterior of the top floor will be covered in shrink wrap. All three entrances (two in the front and one in the rear) will remain open throughout. In addition to replacing the roof, work will be done on drains as well as windows and sky lights on the top floor. An area around the southeast corner of the building will be fenced off as a worksite. As a result of the works in B115, the general hotdesk area in B110 has changed to provide Business School staff with space. The new general hotdesk area in B110 is shown in yellow on the diagram.
|
| Property | The project scope is still being finalised. In addition to the core requirement to relocate EAS, a number of potential additional facilities (“wish list”) are being explored, including:
Vet Clinic Dog Run Arena Quarantine Facilities |
EAS Relocation | Planning commences March 2026 | Engagement with the Head of School to progress and refine the project scope
Engagement with suppliers to identify minimum viable product (MVP) options and achieve best value for money
Planned Next Steps • Finalise the scope for the EAS relocation, while continuing discovery work on the “wish list” options. • Complete and submit a business case for approval of the EAS relocation and associated budget. |
| Property | Water Mains Upgrade | Upgrading Water Mains | Detailed scoping is underway to identify pipework, valve, and sprinkler sections requiring upgrade. While a budget has been allocated to the relevant cost centre, a formal business case will still be required to seek approval for funding
Planned Next Steps • Complete detailed scoping of the required works (in progress). • Proceed to tender to obtain pricing. • Complete and submit a business case for funding approval. |
|
Articles |
| New Fire Training Facility at the Mt Albert Campus |
| Digital tools for collaboration across MIT and Unitec |
Past Property updates:
2025 Property Project – FM Projects List – Te Aka